Outdoor Living Today SR812 Instrukcja Użytkowania i Eksploatacji

Przeglądaj online lub pobierz Instrukcja Użytkowania i Eksploatacji dla Nie Outdoor Living Today SR812. Outdoor Living Today SR812 Use and Care Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 34
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
8x12 Santa Rosa
Assembly Manual
Some of the safety and usage measures you may wish to consider include:
-snow load ratings vary by geographical location. If heavy or wet snowfall occurs, it is advisable to sweep the
snow off the roof(s).
-if the product is elevated, any structural and building code requirements are solely the customer's
responsibility, and should be abided by.
-in high or gusty wind conditions it is advisable to keep the structure securely grounded.
-have a regular maintenance plan to ensure screws, doors, windows and parts are tight.
Customer agrees to hold Outdoor Living Today Partnership and any Authorized Dealers free
of any liability for improper installation, maintenance and repair.
Version #12
Revised May 8, 2012
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 1
In the event of a missing or broken piece, simply call the Outdoor Living Today Customer
Support Line @ 1-888-658-1658 within 30 days of the delivery of your purchase. It is our
commitment to you to courier replacement parts, free of charge, within 10 business days of
this notification. Replacement parts will not be provided free of charge after the 30 day grace
period.
Thank you for purchasing
an 8x12 Santa Rosa Garden
Shed from Outdoor Living
Today. Please take the time
to identify all the parts prior
to assembly.
Safety Points and Other onsiderations:
Our products are built for use based
on proper installation and normal
residential use, on level ground. Please
follow the instruction manual when
building your Cabana and retain
the manual for future maintenance
purposes.
Przeglądanie stron 0
1 2 3 4 5 6 ... 33 34

Podsumowanie treści

Strona 1 - Assembly Manual

8x12 Santa Rosa Assembly ManualSome of the safety and usage measures you may wish to consider include:-snow load ratings vary by geographical location

Strona 2 - Parts List:

20. To complete walls, attach the Narrow Porch Wall to front wall panel. Note: the narrow wall isonly 73” high. Attach wall stud to adjoining wall w

Strona 3 - Tools Required (Not Provided)

22. When all walls are attached together,check alignment with the floor. Bottom wallplates should sit flush with outside of floorframe. When positione

Strona 4 - A. Floor Section

25. Position the FrontTop Plates on top of DoorHeader and front wallpanel. There are 2 plates(72” and 19” long). Fronttop plates are straight cuton t

Strona 5

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected] 13Top Plate Front ExtensionA.B.C.Handrailequallyspac

Strona 6 - 9. With Floor Runners

28. When both porch sections are completed, lift Right Side Section into place on deck beneath theside top plate. Attach Wall Trim/ Support to wall w

Strona 7 - B. Wall Section

32. Align Top Door and space as per Bottom Door on sides. Leave a 1/4” gap between the Bottomand Top Door. When in correct position, secure hinges to

Strona 8 - 14. Starting with All

37. Position the Rear Gable Wall on top ofthe Rear Top Plate. The rear gable framingshould sit flush with the inside of the top plate.It should also

Strona 9 - Rear Wall Panel

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected] 17OutsideRoofPanels (2)Middle RoofPanels (2)Exploded

Strona 10 - Side Wall

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected] 1843. Attach end of a 68 1/4” long Soffit Bo

Strona 11 - Caulking

44. Carefully lift 1 completed Rafter Section up (make sure Soffit is facing down) and place on gableframing.46. To confirm Rafter Section alignment -

Strona 12 - 26. Complete all side

Parts List:A. Floor Section 3 - 45 1/2” x 75” - Floor Joist Frames 3 - 45 1/2” x 21” - Floor Joist Frames2 - 45 1/2” x 75” - Plywood Floor - Large2 -

Strona 13 - Rear View

47. When Rafter Section is aligned correctly, tack Rafter Section temporarily down from MiddleGable Wall framing into Rafter with 2 - 2” screws.Gable

Strona 14 - 30. Complete Left Side Porch

51. With both Rafter Ridge Boards connected, completely secure Rafters to Gable framing of bothrear and middle Gable Walls. Use 8 - 2” screws per gabl

Strona 15

52. Attach Rafters in porch area into Top Plateof porch with 1 - 2 1/2” screw per Rafter. Onceagain, measure 91” from inside of wall plate towall plat

Strona 16

Roof Plywood flushwith rafter end.58. From the outside, screw down through bottom row of shingles into rafter with 1 - 2 1/2” screw.Locate Middle Roof

Strona 17 - C. & D. Rafter and Roof

59. Align Middle Roof Panel as per Step 58 and screw panel down to rafters with 2 - 2 1/2” screwsin the bottom row of shingles. Lift up 2nd Outside Ro

Strona 18

Exposure Line64. Roof Filler Shingles are includedto cover roof seams. Starting at the bottom, slide the first Long Filler Shinglein until flush with

Strona 19 - Ridge Board

66. Slide in another Filler Shingle andattach as per Step 65. On your lastrow of shingles, the filler shingle isprecut to fit properly. Attach to roo

Strona 20

E. Miscellaneous SectionCedar RidgeRoof Caps Side Facia (4)HorizontalTrim aboveDoor (2)Bottom Skirting Sides & Rear (8)Narrow Trims (6)FlowerBox (

Strona 21

72. Attach Filler Trims(2 - 1/2” x 2 1/2” x 75”) torear walls. Hammer with 8 - 1 1/2” finishing nails.Trims are positioned flushwith siding and botto

Strona 22

74. Attach six Narrow Trims (6 - 1/2” x 2 1/2” x 79” long) to both sides of the shed. Use 8 - 1 1/2”finishing nails per piece. 75. Attach Rear Wall S

Strona 23

8x12 SANTA ROSA HARDWARE SHEET2 1/2”Note: screws and nails shown actual size.2”1 1/4”3/4”2” 3/4”1 1/2” 1 1/4”Tee Hinge x4Pull HandleRidge Board Conne

Strona 24

76. Position Back Facia (angle cut on ends) and Side Facia (square cut ends) in corner. Line Faciaup so square cut Facia is positioned between angled

Strona 25

81. Attaching the Gable Gusset is next. Screw 4 90 degreeSimpson Strong Ties up into plywood of roof panel with 2 -1 1/4”screws (see picture). Plac

Strona 26 - Roof Plywood

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected] 3282. Attach Gable Facia to exposed plywood of gable

Strona 27 - E. Miscellaneous Section

86. Attach Door Handle, Exterior Barrel Bolt and Interior Barrel Bolt to door. Handle is positionedon top door, Barrel Bolt on bottom door and Interio

Strona 28 - 71. There are 2 Front

Congratulations on building your8x12 Santa Rosa Garden Shed!Note: Our Sheds are shipped as unfinished products. If exposed to the elements, the west

Strona 29 - Rear Wall

FlushwithframingPlywood FloorLarge (2)Floor JoistFramesLarge (3)Floor Runners (10)Plywood FloorSmall (2)Exploded view of all parts necessary to comple

Strona 30 - Side Facia

7.Attach Floor Runners to completed floor frame.There are 2 floor runners per 136 1/2” side and 5completed runners in total. Use 6 - 2 1/2” screwsper

Strona 31

10. Position Plywood Floor pieces (4) on top of completedfloor joists. Plywood will sit slightly back from outside edge ofFloor Joist Framing. Hint:

Strona 32

Exploded view of all parts necessary to complete theWall Section. Identify all parts prior to starting.13. Lay out all the wall panels and become fam

Strona 33

16. Starting at Rear Corner, position a Wall Panel on top of plywood floor. Depending on your preference, you may use a solid or window wall panel in

Strona 34 - 8x12 Santa Rosa Garden Shed!

17. Position rear corner wall into place and attach together with3 - 2 1/2” screws. Screw at the top, middle and bottom of 2x3stud.Start positioning

Komentarze do niniejszej Instrukcji

Brak uwag